Abstract
This quality improvement paper uses the Model for Improvement to tackle long waits between arrival and first provider contact in a community emergency department. It defines the aim, measures and change ideas, documents three rapid PDSA cycles, and interprets run-chart data using Donabedian’s structure–process–outcome framework.
Outline
- 1Background and aim statement
- 2Measures
- 3Change ideas
- 4PDSA cycles 1–3
- 5Results and run chart
- 6Lessons learned
Excerpt
The Model for Improvement asks three questions: What are we trying to accomplish? How will we know that a change is an improvement? What change can we make that will result in improvement? Our aim was specific: reduce median door-to-provider time from 48 to 30 minutes within 90 days.
The first PDSA cycle tested a provider-in-triage model on weekday mornings only. Small, time-limited tests allowed staff to try the change without committing the whole department, and the data from each cycle shaped the next one. Results are reported following SQUIRE 2.0 guidance.
The full paper continues for 7 pages
Need a custom paper on your own topic and rubric? A MSN-level writer can start today.
Order a similar paperReferences (selected)
- Langley, G. J., Moen, R. D., Nolan, K. M., Nolan, T. W., Norman, C. L., & Provost, L. P. (2009). The improvement guide: A practical approach to enhancing organizational performance (2nd ed.). Jossey-Bass.
- Donabedian, A. (1988). The quality of care: How can it be assessed? JAMA, 260(12), 1743–1748.
- Ogrinc, G., Davies, L., Goodman, D., Batalden, P., Davidoff, F., & Stevens, D. (2016). SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence): Revised publication guidelines from a detailed consensus process. BMJ Quality & Safety, 25(12), 986–992.
This sample is published to show our writing quality. Do not submit it as your own work — it is publicly available and will be detected by plagiarism checkers.